個案總覽
依發行單位、學門或關鍵字,找到適合的教學個案。
-
Red Cross Children's Home: Building Capabilities in Guyana (B)
This is a supplement to Red Cross Children's Home: Building Capabilities in Guyana (A), product 9B02C042. An orphanage and foster care home for young children in Guyana was staffed by women who were paid a small monthly stipend. The facility was in poor physical state, the 54-hour workweek was exhausting and absenteeism was rampant. The new director tried to turn the facility around by repairing the building, improving the working conditions and seeking staff input. On the country's national holiday, however, none of the staff reported for work. The director decided to implement new rules and a system of accountability. When the local public hospital staff went on strike, the director of the children's home was asked to run the hospital with its volunteers. After eight weeks, she returned to the children's home to discover that it was thriving, despite her absence. She decided that her work was completed and she returned to Canada. In supplemental case Red Cross Children's Home: Building Capabilities in Guyana (C), product 9B02C048, the former director visits the children's home after an absence of nearly two years and reflects on her management efforts. -
Red Cross Children's Home: Building Capabilities in Guyana (C)
An orphanage and foster care home for young children in Guyana was staffed by women who were paid a small monthly stipend. The facility was in poor physical state, the 54-hour workweek was exhausting and absenteeism was rampant. The new director tried to turn the facility around by repairing the building, improving the working conditions and seeking staff input. On the country's notational holiday, however, none of the staff reported for work. The director decided to implement new rules and a system of accountability. When the local public hospital staff went on strike, the director of the children's home was asked to run the hospital with its volunteers. After eight weeks, she returned to the children's home to discover that it was thriving, despite her absence. She decided that her work was completed and she returned to Canada. Nearly two years later, the former director visited the children's home and reflected on her management efforts. This is a supplement to Red Cross Children's Home: Building Capabilities in Guyana (A), product 9B02C042 and Red Cross Children's Home: Building Capabilities in Guyana (B), product 9B02C047. -
Juan Pedro's Shrimp Farm: or the 48-hour Exam Nightmare (B)
A learning team of five students must work together to complete a 48-hour team exam. When the team members convene to write their report, one of the students shows up eight hours late. The report outline is nearly complete, yet he insists on questioning the work and offering uninvited comments. As the irritation level builds, another student takes him out to fetch refreshments for the team. Away from the rest of the team, the student starts discussing the exam with other students, divulging some of his own team's strategies. This is a supplement to Juan Pedro's Shrimp Farm: Or the 48-hour Exam Nightmare (A), product 9B02C057, which discusses the process of the competitive 48-hour exam, the reputation of the fifth student and the initial meeting of the team. Supplement Juan Pedro's Shrimp Farm: Or the 48-hour Exam Nightmare (C) product 9B02C059, describes the student's attempt to contribute to the report and the subsequent confrontation. Supplement Juan Pedro's Shrimp Farm: Or the 48-hour Exam Nightmare (D) product 9B02C060, an interview, conducted several months later, provides the student's perspective on the events. -
Juan Pedro's Shrimp Farm: or the 48-hour Exam Nightmare (C)
A learning team of five students must work together to complete a 48-hour team exam. When the team members convene to write their report, one of the students shows up eight hours late. The report outline is nearly complete, yet he insists on questioning the work and offering uninvited comments. When he is left alone to work on the editing process, his progress is slow, the master copy of the report is corrupted and many spelling and grammatical errors are missed. The irritation level builds to loud arguments in the middle of the night. This is a supplement to Juan Pedro's Shrimp Farm: Or the 48-hour Exam Nightmare (A), product 9B02C057, which discusses the process of the competitive 48-hour exam, the reputation of the fifth student and the initial meeting of team. Supplement Juan Pedro's Shrimp Farm: Or the 48-hour Exam Nightmare (B), product 9B02C058, describes the first hour after the student arrives to work on the report and supplement Juan Pedro's Shrimp Farm: Or the 48-hour Exam Nightmare (D), product 9B02C060, an interview, conducted several months later, provides the student's perspective on the events. -
Juan Pedro's Shrimp Farm: or the 48-hour Exam Nightmare (D)
A learning team of five students must work together to complete a 48-hour team exam. When the team members convene to write their report, one of the students shows up eight hours late. The report outline is nearly complete, yet he insists on questioning the work and offering uninvited comments. The irritation level builds to loud arguments in the middle of the night. In this supplement, the fifth student is interviewed to provide his perspective on the events. This is a supplement to Juan Pedro's Shrimp Farm: Or the 48-hour Exam Nightmare (A), product 9B02C057, which discusses the process of the competitive 48-hour exam, the reputation of the fifth student and the initial meeting of the team. Supplement Juan Pedro's Shrimp Farm: Or the 48-hour Exam Nightmare (B), product 9B02C058, describes the first hour after the student arrives to work on the report, and supplement Juan Pedro's Shrimp Farm: Or the 48-hour Exam Nightmare (C) product 9B02C059 describes the student's attempt to contribute to the report and the subsequent confrontation. -
CIBC: Outsourcing the Human Resources Department (B)
The Canadian Imperial Bank of Commerce was the first major financial institution in Canada and among the first in North America to team up with an external supplier to manage its human resource operations and technology services. As such, the company required a carefully structured contract that included the necessary requirements and at the same time left room for flexibility and change. This is a supplement to CIBC Human Resources (A), product 9B02C062. -
Air New Zealand: The Recapitalization Decision (B)
This is a supplement to Air New Zealand: The Recapitalization Decision (A), product 9B02N017. The chairman of Air New Zealand is chairing the company's first annual meeting and is faced with a number of financial and strategic issues that have an impact on the survival of the airline. -
Linda Fay Harris
Presents profiles written by six members of the HBS Class of 1976 from the 10th and 20th reunions. The six alumni represent a cross section of the class of 1976 and provide a snapshot of life at the time of the reunions. -
Samuel Allston
Presents profiles written by six members of the HBS Class of 1976 from the 10th and 20th reunions. The six alumni represent a cross section of the class of 1976 and provide a snapshot of life at the time of the reunions. -
Patricia Hughes Mason
Presents profiles written by six members of the HBS Class of 1976 from the 10th and 20th reunions. The six alumni represent a cross section of the class of 1976 and provide a snapshot of life at the time of the reunions. -
Matthew J. Martin
Presents profiles written by six members of the HBS Class of 1976 from the 10th and 20th reunions. The six alumni represent a cross section of the class of 1976 and provide a snapshot of life at the time of the reunions. -
Richard Oliva
Presents profiles written by six members of the HBS Class of 1976 from the 10th and 20th reunions. The six alumni represent a cross section of the class of 1976 and provide a snapshot of life at the time of the reunions. -
Anne F. Baird
Presents profiles written by six members of the HBS Class of 1976 from the 10th and 20th reunions. The six alumni represent a cross section of the class of 1976 and provide a snapshot of life at the time of the reunions. -
Mobil in Aceh, Indonesia (B)
In December 1998, Ron Wilson, chief executive of Mobil Oil Indonesia (MOI), considered how he should respond to allegations made by a group of nongovernmental organizations that Mobil had been complicit in serious human rights abuses in Aceh, Indonesia. MOI, established in 1968, was a joint venture between Mobil and the Indonesian oil company Pertamina. Based in Lhokseumawe, MOI was responsible for setting and managing the terms of the various contracts with Pertamina and the Indonesian government and for establishing and managing the exploration and exploitation operations. As a location, Aceh was far from convenient. But could any of the team at Mobil have imagined just how challenging managing operations in Aceh would be? -
Charles Schwab in 2002, Spreadsheet Exercise
Supplements Charles Schwab in 2002. -
Gary Rodkin at Pepsi-Cola North America (B)
After assuming the position of CEO of Pepsi-Cola North America (PCNA), Gary Rodkin faces organizational problems within PCNA and external friction between PCNA and its largest bottler, the Pepsi Bottling Group. In addition to the challenge of organizational alignment, this case also provides an opportunity to examine effective leadership, reorganization, and brand management in the context of the beverage industry. -
Gary Rodkin at Pepsi-Cola North America (B) (Abridged)
After assuming the position of CEO of Pepsi-Cola North America (PCNA), Gary Rodkin faces organizational problems within PCNA and external friction between PCNA and its largest bottler, the Pepsi Bottling Group. In addition to the challenge of organizational alignment, this case also provides an opportunity to examine effective leadership, reorganization, and brand management in the context of the beverage industry. -
WD-40 Company: The Squeak, Smell, and Dirt Business (B)
In the fall of 1999 Garry Ridge, the newly appointed CEO of WD-40 Company, wanted to rejuvenate the company and stimulate its employees to look beyond the firm's relatively narrow focus of the last 43 years. The very nature of WD-40 Company's success in capturing the market had created its own limited growth opportunities. The A case describes the company's one-product business success, and Ridge's background. The B case reveals some of the challenges Ridge faced in implementing change. The B case tells how the new CEO helped WD-40 company achieve growth in both new products and markets through related acquisitions. Despite these purchases, though, the company's earnings failed to climb in the years between 1998 and 2001. Ridge concluded that he needed to do more than just buy more companies, so he framed a model of strong leadership and "learning theory" that he thought would enable the company outsmart its competitors. He built a framework that was demanding, yet forgiving, when individuals fell short. Ridge held employees responsible for their results, but he encouraged everyone to acknowledge mistakes and learn from them. The company's financial results suggest success for his leadership model. This case set lends instructors a valuable tool to conduct conversations in the classroom about leadership and leading strategic change. -
Orion Controls (B)
Avion is interested in a new valve to manage the highly volatile phenol in its production process. Avion and Orion strike a deal for Orion to try to produce these valves. There are time, engineering, and software constraints that make the valve-redesign project a risky endeavor. The A case (UVA-QA-0602) consists of a basic decision tree that has been used as an introductory case in decision analysis and in the core material for an exam. The A case is a rewrite of two earlier cases (QA-0480 and QA-0481). In those cases, the key issues surround the scheduling of the projects, leading to insights about which to schedule first. Here, the scheduling is fixed and the issues are less calculation-intensive and more interesting. In the A case, there are two options: one the students usually see and one they don't. The B case consists of a quick series of changes in the situation that leads to a totally different decision structure and requirement for simulation modeling (or some other technique to handle the introduction of continuous uncertainties). This case also has a wonderful real option embedded in the problem around which an entire class can be built. Because the estimate is continuous, the option problem becomes one of finding the optimal estimated-performance value at which one aborts the software redesign. -
Group Process in the Challenger Launch Decision (D)
Supplements the (A) case.