學門類別
政大
哈佛
最新個案
- Leadership Imperatives in an AI World
- Vodafone Idea Merger - Unpacking IS Integration Strategies
- Snapchat’s Dilemma: Growth or Financial Sustainability
- V21 Landmarks Pvt. Ltd: Scaling Newer Heights in Real Estate Entrepreneurship
- Predicting the Future Impacts of AI: McLuhan’s Tetrad Framework
- Did I Just Cross the Line and Harass a Colleague?
- TNT Assignment: Financial Ratio Code Cracker
- Porsche Drive (A): Vehicle Subscription Strategy
- Porsche Drive (A) and (B): Student Spreadsheet
- Porsche Drive (B): Vehicle Subscription Strategy
-
Lawn Bowling at the Komodo Dragon Resort: Negotiating a Deal in Indonesia - Presentation
Presentation to accompany product W41651. -
The Offer: Compensation in Consulting - .r code
Other File Type to accompany product W38324. -
Toward Zero Waste: RecycleRight at the National University of Singapore – Python Code
-
Toward Zero Waste: RecycleRight at the National University of Singapore - R codes
Supplemental R code to accompany product W37340. -
London Hydro Inc. - .r code
-
A-Media Limited - Optimistic Durations and Resource Levelled
This MPP file is the second of two MS Project files that accompany W33313. -
A-Media Limited - Pessimistic Durations
This MPP file is one of two MS Project files that accompany W33313. -
Institute of Rural Management Anand (IRMA) Course Timetabling Challenge - CPlex Solution File
CPlex solution file to accompany product W27141. -
A Technical Note on Push-Pull Marketing Systems - Program Files
Supplement for product W25455. -
Education Store - Instructor Supplement
Supporting material for teaching note, product 8B03E22. -
Niagara Falls Construction Project: Scheduling, Resources, Costs and Bureaucracy - MS Project - Minimum Time
MS Project Minimum Time for teaching note product 8B15D007. The use of this file requires MS Project software. -
Niagara Falls Construction Project: Scheduling, Resources, Costs and Bureaucracy - MS Project - Most Likely Time
MS Project Most Likely Time for teaching note product 8B15D007. The use of this file requires MS Project software. -
Niagara Falls Construction Project: Scheduling, Resources, Costs and Bureaucracy - MS Project - Maximum Time
MS Project Maximum Time for teaching note product 8B15D007. The use of this file requires MS Project software. -
American Constructors Inc.: World Outreach Expansion Project - MS Project - Minimum Time
MS Project Minimum Time for teaching note product 8B10D016. -
American Constructors Inc.: World Outreach Expansion Project - MS Project - Maximum Time
MS Project Maximum Time for teaching note product 8B10D016. -
American Constructors Inc.: World Outreach Expansion Project - MS Project - Most Likely Time
MS Project Most Likely Time for teaching note product 8B10D016. -
Toronto Sun and Caribana - MS Project - Maximum Time
MS Project file showing the maximum time. -
Toronto Sun and Caribana - MS Project - Most Likely Time
MS Project file showing the most likely time. -
Toronto Sun and Caribana - MS Project - Minimum Time
MS Project file showing the minimum time. -
Cells For Life (A) Data Set
Supporting data set for the (A) case, product 9B09E010.