The F/A-18 F404 Engine: Getting Lean (A)

內容大綱
The U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore Power Plants Division (F404 engine maintenance) was a real mess. Not-Ready-For-Issue parts were everywhere. Division through-put was poor (35 engines and 190 modules awaiting maintenance), there were 30 F/A-18 aircraft with bare firewalls (no engines), the maintenance crews were working 12-hour days, manning was at 61% of authorized levels, reenlistment rates were an abysmal 50%, and crew morale was lousy. And more parts and engines arrived in daily. The Officer-in-Charge of the Aircraft Intermediate Maintenance Detachment decided to use Lean manufacturing to tackle the challenge. It would be the first application of the Lean concept to Naval Aviation.
涵蓋主題
新增
新增