個案總覽

依發行單位、學門或關鍵字,找到適合的教學個案。

  • Oakville Hydro Optimum Engine Selection

    The president of Oakville Hydro Energy services needed to make a decision on the installation of an electricity-generating engine at the regional municipal Wastewater Treatment Plant in Burlington, Ontario. This engine installation was in support of the production of green power, and the Ontario Power Authority (OPA) had introduced a feed-in tariff that paid a premium for the generation of this type of green power. One of three specific engines would be purchased and installed to generate electricity from the combustible gases produced during wastewater treatment. The president had to decide which engine generator would produce the most favourable output and the best return for Oakville Hydro and the municipality. The president also needed to decide whether or not to integrate the existing on-site gas storage tank into the controls of the generator system.
    詳細資料
  • Oakville Hydro Optimum Engine Selection

    The president of Oakville Hydro Energy services needed to make a decision on the installation of an electricity-generating engine at the regional municipal Wastewater Treatment Plant in Burlington, Ontario. This engine installation was in support of the production of green power, by which the Ontario Power Authority (OPA) introduced a feed-in tariff that paid a premium for the generation of this type of green power. One of three specific engines would be purchased and installed to generate electricity from the combustible gases produced during wastewater treatment. The president had to decide which engine generator would produce the most favourable output and the best return for Oakville Hydro and the municipality. The president also needed to decide whether or not to integrate the existing on-site gas storage tank into the controls of the generator system.
    詳細資料