學門類別
政大
哈佛
最新個案
- Leadership Imperatives in an AI World
- Vodafone Idea Merger - Unpacking IS Integration Strategies
- Snapchat’s Dilemma: Growth or Financial Sustainability
- V21 Landmarks Pvt. Ltd: Scaling Newer Heights in Real Estate Entrepreneurship
- Predicting the Future Impacts of AI: McLuhan’s Tetrad Framework
- Did I Just Cross the Line and Harass a Colleague?
- TNT Assignment: Financial Ratio Code Cracker
- Porsche Drive (A): Vehicle Subscription Strategy
- Porsche Drive (A) and (B): Student Spreadsheet
- Porsche Drive (B): Vehicle Subscription Strategy
-
American Automobiles Limited: Production Planning - Instructor Spreadsheet
Spreadsheet for product 8B16D022. -
American Automobiles Limited: Production Planning
In 2015, the managers for a major car manufacturer in the United States, American Automobiles Limited, were faced with a pressing problem in their press shop. The press shop made body panels for the company’s 10 different car models using a stamping process. In all, 137 different body panel parts were produced by six press machines. Each press had a distinct stroke rate that decided the time per stamping operation. Time was lost in changing dies, and there were limits on the lot sizes in which the panels could be stamped. Also, some panels could be stamped only on certain presses. The press shop’s managers were seeking to allocate the parts to panels in such a way that total costs could be minimized. How could they accomplish this?